Photos and notes from on the road. A biologist at heart. A 'retired' network administrator and lifelong photographer. Living in Ashland Wisconsin on Lake Superior's Chequamegon Bay.
Saturday, September 23, 2006
Removal of Vaughn Ave. north Soo Line bridge.
This week saw the removal of the north Soo Line bridge crossing over Vaughn Ave. It was a week long project with the majority of the salvaged steel removed from the site by Friday. Local media reports that the Main Street (2nd) east end viaducts and scheduled for removal. I'll be watching.
No comments:
Post a Comment